1. Size one week of costs
Add up what a normal two weeks costs you: bills, groceries and gas. Divide by two. That is one week of costs, and it is the size of this cushion. Say you are paid $1,050 every two weeks, and the costs are $850 for the two weeks.
| Check | $1,050 |
| Bills, groceries and gas for two weeks | −$850 |
| Left after those costs | $200 |
| One week of costs: $850 ÷ 2 | $425 |
The goal is $425. The $200 left each check is also what your daily number comes from, so every dollar you set aside comes out of the days.
2. Pick an amount for each check
Divide $425 by the amount you set aside each check, and round up to the next whole check.
| Set aside each check | Checks to reach $425 | About how long |
|---|---|---|
| $25 | $425 ÷ $25 = 17 | 34 weeks |
| $50 | $425 ÷ $50 = 8.5, so 9 | 18 weeks |
| $100 | $425 ÷ $100 = 4.25, so 5 | 10 weeks |
This is arithmetic, not a promise. It assumes every check comes in the same and nothing needs the money along the way. A real month will have surprises, so treat the weeks as a rough guide.
3. See what it does to the daily number
Take the amount out first, then divide what is left across the 14 days.
| Set aside | Left to spend | Daily number |
|---|---|---|
| $0 | $200 | $200 ÷ 14 = $14.29, so $14 |
| $25 | $175 | $175 ÷ 14 = $12.50, so $12 |
| $50 | $150 | $150 ÷ 14 = $10.71, so $10 |
| $100 | $100 | $100 ÷ 14 = $7.14, so $7 |
Each choice is a trade. A smaller amount keeps more for today and takes longer. A larger amount is faster and makes the days tighter. If $7 a day is not realistic for you, the $25 row may be the one to start with.
4. Give the cushion rules
Decide before you need it what counts. For example: a late check, a cut in hours, or a bill you did not know about. Write the rule where you can see it. If the money is only there for a short week, then a weekend out is not a short week, and you know the answer ahead of time. Keep it in a place that is a little hard to reach, such as a separate account or an envelope at home, not in the account you spend from.
If you are already behind, start with catching up on a late bill. If your check changes from week to week, budgeting with an irregular paycheck shows how to plan on a floor.
Questions
How big should a one-week cushion be?
One week of your costs: bills, groceries and gas for two weeks, divided by two. In the example above that is $425.
How long does it take to build a one-week cushion?
Divide the cushion by what you set aside each check. In the example, $50 a check reaches $425 in 9 checks, or about 18 weeks, if nothing changes.
Should I build a cushion or pay a late bill first?
That is your call. A late bill keeps getting older, so many people list it first. The late bill page shows the math on paying it at once or in two parts.
Does Penny Payday build a cushion for me?
No. Penny does the arithmetic on the numbers you type in, including a set-aside line, and shows what is left each day. It does not move money. It is iPhone only.
This guide does arithmetic on example numbers. It is not financial advice, and it makes no promise about how much anyone will save.
